Merrimack Station Clean Air Project  


Client:
Public Service Company of New Hampshire
Location:
Bow, New Hampshire
Description:
AZCO INC.'s scope of work includes the erection of 2200 tons of plate steel and boxed ductwork as well as the insulation and lagging on the project. Also included in the scope for the 475MW plant will be 1000 tons of ductwork support steel and miscellaneous steel erection on Units 1 and 2.

 Projects in Progress 
Project :
Empire Generating Station  


Client:
LG Constructors
Location:
Rennselaer, New York
Description:
AZCO ‘s scope of work includes installation of a GE D11 steam turbine and 324 generating unit with the associated piping packages, installation of the critical piping between two HRSG’s and the steam turbine (HPS, HRS, CRS and LPS), erecting the condenser and setting the BOP equipment.

 Projects in Progress 
Project :
Dry Fork Station  


Client:
Basin Electric Power Cooperative
Location:
Gillette, Wyoming
Description:
AZCO was contracted for the erection of all manufacturer supplied equipment including a 385 MW Mitsubishi Steam Turbine/Generator. The list of equipment includes, but is not limited to, feedwater pumps, fire protection skids, miscellaneous pumps, propane storage, ammonia storage, fire protection skids, potable water and water treatment. The scope for these items consists of setting, alignment and the installation of the piping supplied by each manufacturer.

 Projects in Progress 
Project :
Comanche Station  


Client:
Xcel Energy
Location:
Pueblo, Colorado
Description:
AZCO’s initial scope included demolition and installation of the ash handling system, dryers and receivers for Units 1 & 2.

AZCO’s scope was expanded to include procurement, fabrication and installation of new pipe rack, site upgrades including new installation of utility piping, upgrades to existing utility piping, platform installation, structural steel upgrades to existing buildings, blower and air compressor installations.

Water service and treatment pump connections include vertical pump installation and setting of four raw water pumps, three treated water pumps, three ash pond pumps, one de-mineralized water pump and two skids with booster pumps.