Azco

Pipe & Metal Fabrication Services

Subcategory: New Power Plant Construction

KBR / Alliant Energy – Mechanical Installation

Client: KBR / Alliant Energy

Location: Marshalltown, Iowa

Project: Equipment and piping installation for 650MW 2x1 combined cycle power plant, UG piping, AG piping, and shop fabrication in support of field operations

Scope: Installation of all UA piping and associated equipment skids for two Siemens SGT6-5000F gas turbine / generators, two Nooter Eriksen heat recover steam generators, and one Siemens SST6-5000 steam turbine / generator for a 650 2x1 combined cycle power plant. Installation includes, but is not limited to, the installation of 26,000 feet of underground piping, 97,000 feet of above ground piping, and the setting of all associated balance of plant equipment.

AZCO's Fabrication Division is providing shop-fabricated carbon steel underground piping systems as well as high-pressure, critical alloy piping, and balance of plant piping in support of AZCO's field construction.