Basin Electric – Dakota Gasification Center

Client: Basin Electric Power Cooperative

Location: Beulah, North Dakota

Scope: AZCO was contracted to complete the mechanical scope of the Urea Project including installation of 58,000 LF of pipe ranging from .5” to 30” diameter; set, align, and grout over 50 pieces of equipment; erect and detail 1,100 tons of steel; and install 1,800 LF of ductwork.

The Urea plant was tied into an existing gasification facility and the urea side will be able to produce 1,100 tons of urea daily with the ability to shift production to diesel exhaust fluid as needed.